In the morning of July 21, the news reporter learned from China National Railway Group Co., Ltd. (China Railway Group) that due to the heavy rain in Henan Province, the Zhengxi High-speed Railway and Longhai Railway between Zhengzhou and Luoyang had flooded lines, collapsed subgrades, and collapsed roadbeds. The equipment is flooded and the train cannot pass; the transportation order of the Beijing-Guangzhou High-speed Railway, Xulan High-speed Railway, Beijing-Guangzhou Railway, Longhai Railway, Jiaoliu Railway, Ningxi Railway and other lines passing through Zhengzhou area are all affected to varying degrees.

In response to the above situation, the railway department has adopted measures such as speed limit operation, waiting to avoid halfway stations, and suspension to ensure train safety; organize railway units and cadres and employees along the way to train in transit Provide food, drinking water and other materials to ensure the supply of train meals.

China Railway Group reminds that for specific train operation status, passengers are requested to pay attention to information channels such as station announcements, official Weibo and WeChat.