< img ALT = "on August 25, in the plant area of Sichuan Investment (Dazhou) gas power generation company in Dazhou, Sichuan high tech Zone, technical personnel inspected the booster station. Visual china map" style = "width: 600px;" src=" https://imagecloud.thepaper.cn/thepaper/image/213/139/476.jpg ">

on August 25, in the plant area of Sichuan Investment (Dazhou) gas power generation company in the high tech Zone of Dazhou, Sichuan Province, technicians inspected the booster station. Visual china map < / P > the reporter learned from the state grid that with the decrease of temperature and rainfall in some areas, the tense situation of power consumption in Sichuan has been alleviated. < br > < div class =" continuous height "> < / div > it is reported that on the 28th, the daily power generation capacity of Sichuan Hydropower was 460 million kwh, up 9.5% from the lowest value in the previous period. As of 12:00 on the 28th, the general industrial and commercial power consumption in Sichuan Province has been restored. Except for the high-energy industries, the power consumption of large industries is gradually restored. After the continuous improvement of the incoming water of hydropower, the power consumption of large industries will be restored to normal.